A quote has inspection in it. But how many RT films you need comes from weld seam lengths, and the seams come from how the plate gets cut and joined. Which is why that number has always arrived after the drawing.
To count films you have to know which weld seam is how many millimetres long. And seams are not fixed by the shape alone — how many plates you cut the shell from decides whether there is one longitudinal seam or three.
That layout depends on the thickness, and the thickness depends on the strength calculation being finished. So it sits at the very end of the chain.
But the person who needs the number is usually in sales. They have to put out a quote, and for that a drawing has to exist first. Asking engineering to draft one for an enquiry that has not even been won yet is a hard ask.
So what actually happens is this — it gets approximated and passed over. Pulled from a similar job, padded, or left out of the quote altogether. And when the real count turns up later, the quote is off by that much.
AUTONEST VC settles the developed sizes and the plate layout inside the same run that settles the thickness. At that point it already knows where the seams are and how many, so seam lengths and film counts come out with everything else.
The point is that it is a computed value, not something measured off a drawing. The drawing comes out of the same run — but the film count is not waiting on it.
There are two ways to count, depending on the inspection scope.
| Scope | One film covers | Count |
|---|---|---|
| SPOT RT | 300 mm | 20% of the segments (= length / 300, rounded up), rounded up |
| FULL RT | 250 mm | length / 250, rounded up |
So a 1,700 mm longitudinal seam under FULL is 1,700 / 250 = 6.8 → 7 films; under SPOT it is 1,700 / 300 = 5.67 → 6 segments, 20% of that is 1.2 → 2 films.
One film covers less under full coverage because the overlap is different — shooting a continuous run means cutting it shorter and overlapping each shot.
Longitudinal seams, circumferential seams, head seams, the manhole and the jacket closure each carry their own length and their own film count.
On top of that, intersections are counted separately — where a longitudinal seam meets a circumferential one gets its own shot. If the jacket top is a flat closure, that one intersection disappears, and the count reflects it.
The film length around the manhole is an input value (120 mm by default), because shops shoot manholes differently.
There is no separate "RT scope" field. It is the joint efficiency (%) cell, entered separately for shell and head.
| Value | Meaning |
|---|---|
| 70 % | NO RT — no radiography |
| 95 % | SPOT RT — partial |
| 100 % | FULL RT — full length |
That single value goes two places. It enters the thickness calculation as the joint efficiency, and it decides the film count on the weld map.
Which is why this is not only an inspection-cost question. More inspection raises the efficiency and can thin the plate; less inspection thickens it. Inspection cost and material cost move in opposite directions, so they have to be weighed together — and to weigh them you need the film count at quoting time.
A few lines of capacity and conditions, one run, and the per-seam film count comes out alongside the thickness, the drawing and the material list. Inspection cost in a quote can be the real count instead of a guess.
Rates differ by company, so no money figure is produced. The count is the program's job; multiplying by your rate is yours.
The rest of what falls out of the same run — the chain from thickness to a purchase order.
Design is done. Why can't you order? →