An enquiry usually arrives as "one jacketed tank, three tonnes." But to draw anything you need an inside diameter and a length, and one capacity figure does not give you those. There are infinitely many pairs that hold three tonnes. Two ratios fill that gap: the working ratio and the L/D ratio.
It splits immediately: three tonnes when brim full, or three tonnes of actual contents? On site it almost always means the working volume — what you really put in and run.
The top is left empty. Stirring makes the level slosh up, heating brings it to a boil, foam forms, and nozzles and the manhole need to sit above the liquid. So total volume = working volume / ratio, with 75% as the default. Three tonnes working means you start sizing for 4 m3.
That ratio varies by process — more headroom the harder it gets stirred, less if it just sits there. So the program does not decide it; it is an input.
Many sizes hold 4 m3. Narrow and tall, or wide and short. The capacity is the same but everything else changes.
So one variable is fixed first: the L/D ratio — how many times the inside diameter the length should be. The default is 1.14, changeable to suit the space or the shop's habit. Once it is fixed the only unknown left is the diameter, and it falls straight out.
Volume is not just the cylinder. Each head bulges outward and adds to it. Heads are domes, so the wider they get, the faster the volume grows. Each type has its own coefficient.
| Head type | Volume coefficient | Note |
|---|---|---|
| 10% dished | 0.09897 | most common |
| 2:1 semi-elliptical | 0.131 | deeper, holds more |
| Flat cover | 0 | no bulge |
So changing only the head type changes the capacity of the same dimensions. Switch to 2:1 and it holds more, so the body gets shorter for the same three tonnes. The straight tangent lines of the heads also count toward the cylinder volume.
Put together:
| Total | = pi/4 · D² · (shell + top TL + bottom TL) + (top coef + bottom coef) · D³ |
| With L/D fixed | = (pi/4 · ratio + top coef + bottom coef) · D³ |
| So | D · D · D = total / that bracket → solve that for D |
The arithmetic gives you something like an inside diameter of 1483.7. That cannot go on a drawing. It is rounded to 5 mm steps, and at that point the capacity is no longer exactly 3.000.
So the real capacity of the rounded size is recomputed and that is what goes on the drawing. "Ordered 3 t → drawing shows W.V 3.02 t" is the honest statement. Copying the order figure straight onto the drawing would leave it carrying a number its own geometry does not support.
From here the thicknesses are calculated — and there are points where a small change in size drops a thickness a full step.
The size sweep looks for exactly those points, trying diameter and length combinations within 5% of the capacity. One thing is held fixed while it does: the working volume stays. Total volume may move; W.V does not.
Three tonnes ordered and 2.8 delivered is not a saving, it is an incident.
That is what sits between "a three-tonne one" and a drawing. It is routine arithmetic, but by hand each combination takes time to check — so in practice you go with the first one that comes to mind. Not because it is a bad choice, but because there is no time to look at the others.
See the capacity held fixed while the size changes to drop a thickness — on a real case.
Watch: a 3-tonne jacketed tank from one capacity figure →