Calculate one jacketed vessel and the report comes out at more than thirty pages. Shell internal pressure, shell external pressure, top and bottom heads, jacket, closure, nozzles, flanges, sight glasses, relief devices, the welding map, the material list — every one of them needed. And yet the page a reviewer opens first is one of them.

That page is the SUMMARY. This is the story of how that one page was put together.

Header — code applied · vessel type · item no. · drawing no. · working volume Vessel conditions material · pressure · temperature · ID · length Jacket conditions material · pressure · temperature · ID · length Calculation basis allowable stress · thinning · corrosion allowance Verdict tables — all in the same grammar body (shell · heads · jacket) · closure · nozzles · flanges · sight glasses · relief devices · nozzle closures value used value required verdict — PASS / NOT OK
Built so that one pass from top to bottom is enough

You read it top to bottom

The order is the review order.

  1. Header — code applied, vessel type, item number, drawing number, working volume. What this report is about. The code is printed on the first line as MCEE Notice No. 2025-61 (Korea) (same content as the former MOTIE notice; only the ministry name changed). It sits at the very top because it is the first line a reviewer checks.
  2. Three condition boxes — vessel conditions, jacket conditions, and the basis values the calculation used (allowable stress, head thinning rate, corrosion allowance). Inputs and basis sit on the same line so that when a number looks odd, "what was this calculated with" is right beside it.
  3. Verdict tables — from the body through to the fittings. More on those below.

Every table uses the same grammar

This is the part that got the most attention. There are seven tables, and one way of reading them.

Item → condition → value used → value required → verdict
Whichever table you are looking at, that is the order.
TableValue usedValue requiredVerdict
Body (shell · heads · jacket)thickness usedinternal-pressure thickness · allowable external pressurePASS
Jacket closurethickness used · width usedallowable widthPASS
Nozzlesthicknessrequired area · effective areaPASS
Flangesthickness usedcalculated thicknessPASS
Sight glassesthickness usedcalculated thicknessPASS
Relief deviceseffective dischargerequired dischargePASS
Nozzle closuresthickness usedallowable external pressurePASS

Nozzles are judged on area and relief devices on discharge rate. Different physical quantities. But the skeleton is kept identical — put what was used next to what was required, and rule on it.

So a reviewer never has to learn a new way of reading for each table. Running down the rightmost column alone tells you whether the vessel passes, and if a line catches your eye you trace that one line back to the left.

Unused items do not sit there empty — they disappear

If there is one nozzle, the nozzle table is one row. If no sight glass was fitted, the sight glass table is not shown at all. In the report measured for this article, 78 rows were collapsed.

The reason for not leaving blanks is simple. A blank looks like "not filled in yet". The reviewer stops at it, asks, and waits for an answer. For something that was never used, absent is better for everyone.

Conversely, when a value should be there and is missing, that does not pass. If there is no number the verdict is not left blank either — it is left as NOT OK. An invisible pass is the dangerous one.


You do not have to stop at the one page

A summary that is only a summary cannot be reviewed. If the answer to "why is this thickness 3 mm" is not there, that page is just an assertion.

So every line on the SUMMARY has its own calculation sheet behind it. Shell internal pressure, shell external pressure, heads, jacket, closure, each nozzle, each flange — all attached as tabs in the same file. Items that require reading a chart, such as external pressure, even include the actual chart with the point that was read marked on it.

The one page is the page you read first, not the page you read instead. Someone in a hurry finishes there; someone who wants to check has to be able to go down from that spot.

Why it was built this way

People who receive a strength report are usually short of time. They skim it before sending it up, before sending it to the buyer, and once more before inspection. Nobody reads thirty pages each time.

What they need at that moment is one thing — where is this tight? If that is not visible on one screen, the person ends up opening each sheet and building the summary in their head. And that summary is not kept. The next person builds it again.

So that summary was put inside the report, instead of being rebuilt by a person every time. One page holds the whole thing, and if you want the basis you can go down to it from there.