You set out to make one tank and this question attaches itself — "Is this something that has to be inspected?" A pressure vessel becomes legally 'subject to inspection' once it passes certain conditions. And the moment it does, there's something you must do before fabrication. Let's lay out that line. (The laws referenced here are those of the Republic of Korea.)
A vessel holding pressure is dangerous if it goes wrong. So the state draws a line, requiring that past this line you can only make and install it after proving safety and passing inspection. And which law and inspection body have jurisdiction depends on the fluid held and the use. There are three broad tracks.
Even the same "pressure vessel" requires different outputs and inspection procedures depending on which track. The Class 1 / Class 2 covered here is the story of pressure vessels subject to inspection under the Energy Use Rationalization Act. The key yardstick that draws the line compresses to one thing — how strong a pressure (MPa), in how large a volume (m³).
The numbers look small, but most real vessels on the floor clear this line by a wide margin. For example, a jacketed tank heated by steam or a heat-transfer medium at design pressure 0.3 MPa with an internal volume of 0.2 m³ (= 200 L) gives 0.3 × 0.2 = 0.06 — far above 0.004: Class 1. That's why "it's a small tank, so I'll just make it" doesn't hold.
An inspection-subject pressure vessel isn't something you can just draw and cut.
In other words, you can't cut a single plate before the calculation report exists. The strength calculation isn't an optional task — it's the gate to fabrication.
Here the structure of pressure-vessel fabrication shows itself. The client, production, and the floor all want it built a day sooner, but you move forward only by passing the legal safety standard. The starting point of that passage is the strength calculation. If the calculation is late, document filing is late; if documents are late, approval is late; and the delivery slips by that much. If it's not one unit but dozens, that delay can become weeks.
"Is my tank subject to inspection?" mostly ends in "yes." If so, one question remains — how fast and accurately you pass that gate (the strength calculation). That's where delivery is decided.
For reference, AUTONEST VC is optimized for the Energy Use Rationalization Act track among these three — the Korea Energy Agency (KEMCO) track. Taking the Class 1 / Class 2 pressure vessels of this area as its standard, it produces everything from the strength calculation to the report, drawing and material list from a single set of input conditions.